MIL-G-81065A(OS)
4.3 Sampling
4.3.l preproduction sample. A preproduction sample of three gyro-
pendulums manufactured in accordance with 3.1, shall be subjected to the
preproduction tests detailed in 4.5 at an activity designated by the
procuring activity. Acceptance of' the preproduction sample shall be
based on no defects in the sample. Further production of the gyro-
pendulum by the supplier, prior to approval of the preproduction sample,
shall be at the supplier's risk.
4.3.2 Periodic production sampling. Periodic production tests detailed
in 4.6 shall be performed at an activity designated by the procuring
activity. Samples shall consist of units that have satisfactorily passed
the acceptance tests and examinations detailed in 4.7, selected as
follows:
(a ) Step 1. Upon initiation of production, randomly select 5
units from each group of 10 units. Upon satisfactory com-
pliance of samples selected from 3 consecutive groups,
proceed to Step 2.
(b) Step 2. Randomly select 5 units from each group of 25
units. Upon satisfactory compliance of samples selected
from 3 consecutive groups, proceed to Step 3.
(c ) Step 3. Randomly select 5 units from each group of 50 units.
Continue with Step 3 for the balance of the contract or
.
until a defective unit is found.
4.3.2.1 Defective units.
When a defective unit is found in any group,
the supplier shall:
(a) Determine the cause of the defect.
(b) Determine if the defect is an isolated case.
(c ) Take necessary action to eliminate the defects from units on
hand and, if so directed by the procuring activity, from those
units previously shipped.
(d) Submit to the procuring activity for approval, the proposed
corrective action to prevent recurrence of the defect.
(e ) Return to Step 1 (4.3.2(a)) and proceed as indicated for
inspection of units subsequently produced.