MIL-C-82632A(OS
item by the contracor prior to the approval of the procuring activity or comple-
tion of inspection and tests on the preproduction model shall be at the con-
tractors risk. Accepted preproduction models will become the property of the
procuring activity and will be included in the quantity of connectors called for
in the contract or order.
Identification of samples.
TABLE 1.
4.2.1.2 First article inspection. The preproduction model, selected in accord-
ance with 4.2.1 and Table I, shall be subjected to the impactions and tests of
Table II in the sequence listed. When specified in the contract or purchase
order, certified Inspection data covering the results of first article inspections
and tests shall be forwarded to the procuring activity.
TABLE II. First article test sequence
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business